Project Summary At a prominent confectionery site in York, Newsome has installed a efficient 400 kW chiller, marking the timely conclusion of the project. Designed to advance ESG targets, the installation enhances system dependability while minimising overall power consumption and CO₂ levels. https://advicebookmarks.com/story28332023/energy-efficient-400-kw-chiller-installation-achieves-50k-annual-cost-reduction-on-energy-and-200-tonnes-co%E2%82%82-saving