Any time a CPSR is considered required, the ACO is necessary to evaluate the contractor’s system against the eleven standards outlined in FAR forty four. (e) Should the Contractor gets the Contracting Officer’s remaining determination of material weaknesses, the Contractor shall, inside of forty five days of receipt of the https://cpsr44207.buyoutblog.com/33720620/top-cpsr-secrets