The 1st park features a capability of 200 MW though Sandrini II includes a capability of one hundred MW. The overall price of both of those projects weren't disclosed having said that, all through development, about two hundred employees were utilized. The initiatives are anticipated to discover A few positions https://solarinstallersinoakland.blogspot.com/2024/12/4-hacks-to-find-reliable-commercial.html